Attention was paid to the housing stock in Dubossary in 2020. Apartment buildings were erected in the middle of the last century in the town during the construction of the Dubossary hydroelectric station. Last year, roofing and drainage systems were renewed in 21 buildings. Windows were replaced in the entrances of 22 residential buildings, metal entrance doors were installed in 11 houses. 69 objects have been renovated. Engineering communications have been updated in 6 high-rise buildings. Such data was announced today by the Head of the Dubossary state administration Ruslan Chaban during a report to the PMR President. This was reported on the official website of the President. The online meeting was attended by deputies of the Supreme Council, representing the interests of Dubossary residents in the Parliament, Oleg Bayev (deputy of the Supreme Council from the III convocation) and Boris German (elected to the parliament of the VII convocation in November 2020).
7 objects were financed under the capital investment program last year: a building was completed and the premises of the Center for Social and Psychological Rehabilitation of Children with Various Severe Psychophysical Disabilities were fully equipped, repair work was carried out in several kindergartens, Russian-Moldovan school No. 7, sports school for rowing and cycling, windows were replaced in general education, preschool and correctional institutions.
According to the press service of the Supreme Council, the deputy in the constituency 11 "Central" Boris German raised today at the meeting the issue of the state of the road industry in Dubossary. In particular, there is not enough equipment to carry out repair work on the roads.
The parliamentarian expressed his opinion on the improvement of the Energetik Park, located near the Dubossary hydroelectric power station. This year, it is planned to allocate about 3 million rubles from the state budget for the necessary work for the capital investment fund.
The gradual transformation of the park began last year. Tiles were laid on the central alley, lighting was thought over, benches and trash cans were installed, the sidewalk leading to the park was tidied up. A children's playground in the shape of a ship was built.
Residents of the city have been raising the question of the appearance of a sports complex in Dubossary for a quarter of a century. Speaking about the urgency of the problem, Boris German emphasized that Dubossary residents have glorious sports traditions. A place for training is needed. Now they are held mainly in school sports halls. Residents of Dubossary are interested in the work of the cinema.
During the report of the Head of the Dubossary state administration, the topic of water supply to villages was raised. The water supply system was eaten through in the villages of Dubovo, Boska, Novaya Lunga in 2020. If it is possible to implement the plans of 2021, and centralized water supply appears in the village of Doibany-2, then the Dubossary district will be fully covered by the water supply network. At the same time, in Dubossary and the village of Tsybulevka, it is necessary to reconstruct the existing centralized water supply systems.